Concrete contractors Sydney

We place and finish concrete for footings, ground slabs, suspended slabs, walls, columns and cores. Crews sized to the pour, pump and line coordination handled, and finishes checked against the specification as the pour goes down.

Large finished concrete floor slab with a bull float resting on the surface, columns and props beyond

What the concreting package covers

Ground and basement slabs

Large-area slabs placed, vibrated, screeded and finished to the specified class, with joints and falls set out before the truck arrives.

Suspended slabs

Deck pours sequenced to the formwork and propping design, thickness checked on the go, surface finished ready for the next trade.

Footings and pads

Strip and pad footings, pile caps and lift bases placed and compacted against the inspected steel.

Walls, columns and cores

Vertical pours in lifts the form can take, vibrated for a dense face with no honeycombing.

Finishes

Trowel, broom, steel float and burnished finishes to the specification, with tolerances checked before handover.

Curing and protection

Curing compound or wet curing as specified, and the slab kept off until it is ready.

What you get

  • Pour sequences planned with the formwork and steel crews, who are also us
  • Finishes to the specified class, checked as we go
  • Curing compound or wet curing as specified, and the slab protected while it gains strength

Delivered to

AS 3600Concrete structures
AS 1379Specification and supply of concrete
AS 3610Formwork for concrete

The pour follows our own formwork and steel fixing, so there is no handover to wait on. Read how the decks were sequenced on the Blacktown package.

How the concreting package runs with your program

Pours are planned with the formwork and steel crews, who are the same company, so the pour date is set when the deck is propped rather than after the inspection. Joints, falls and set-downs are marked before the first truck, the pump and line are coordinated with the supplier, and the crew is sized to the area going down.

Finish is checked against the specification as the pour progresses, thickness is checked on the go, and the slab is cured and kept clear until it has the strength to carry the next trade. Curing compound or wet curing follows the specification, and the surface is handed over ready for the following trades.

What we need to price concreting

  • For-construction structural drawings with slab thicknesses, set-downs and falls
  • Concrete specification: strength grade, slump, finish class and curing requirement
  • Pour sequence and program dates
  • Whether concrete supply and pump are on our account or the builder's
  • Truck access and pump position

Questions builders ask

How do you price concrete placement?

Per square metre for slabs and per cubic metre or per pour for footings and vertical elements. The rate covers crew, placement, compaction and finish. Supply and pump are usually on the builder's account unless you ask us to include them.

Can you pour the same week the steel is inspected?

Usually yes. Because we also run the formwork and steel fixing, the handover between trades is ours to manage, which keeps pours on program.

What finishes can you deliver?

Trowel, broom, steel float and burnished finishes to the specified class, plus falls to drains where the drawings call for them.

Do you manage the concrete supply?

We coordinate the pour with the supplier and pump on the day. Ordering is on the builder's account unless you want it included in our package.

Price the concreting package.

Send the for-construction drawings and you have an itemised quotation within five working days, rates held for thirty.