The complete structural package, self-performed
Formwork, steel fixing, concrete placement and scaffolding for Sydney head contractors and developers, priced as one itemised package and delivered by crews that share a set-out, a program and a director.

What is in the package and how each part is priced
Formwork
Footings, slabs, walls, columns, cores, stairs
Per m2 by element, or lump sum
Steel fixing
Conventional and PT slabs, footings, walls, cores, mesh
Per tonne; mesh per sheet; day labour for footings
Concrete placement
Ground and suspended slabs, footings, vertical elements, finishes, curing
Per m2 for slabs; per m3 or per pour otherwise
Scaffolding
Perimeter access, stair towers, loading platforms, overhead protection
Lump sum plus included hire, then weekly per m2
No prices are published. The basis is fixed; the rate depends on the drawings. How the rates are built
What a structural package is
A structural package is a single subcontract covering every trade that builds the concrete frame of a building: formwork to form the elements, steel fixing to reinforce them, concrete placement to pour and finish them, and scaffolding for access and edge protection as the structure rises. MK Management Group self-performs all four with its own crews, so the head contractor lets one contract for the structure instead of three or four, runs one program line, calls one inspection per element and receives one payment claim a month with the subcontractor's statement and certificates attached.
Each trade is still measured and priced on its own basis, formwork per square metre by element, reinforcement per tonne, concrete per square metre or per pour, scaffold as a lump sum plus hire, so the quotation stays itemised and any trade can be awarded alone. The package is priced from the for-construction set within five working days.
The handover is the product
A structure split across three or four subcontractors loses days at every handover: the formworker waits on the steel fixer, the steel fixer waits on the engineer, the concreter waits on both. When the trades are one company the sequence is ours to run.
- Deck stripped on cylinder results, by the formwork crew
- Cage tied inspection-ready, by our steel fixers
- Truck booked against the inspection, by our pour crew
- Scaffold lifted and re-certified, by our licensed scaffolders
That is how the 86-apartment package in Blacktown is running: one program line for the structure, one claim a month.
Questions builders ask about the package
Do we have to take all four trades?
No. Each trade is quoted as its own package and can be awarded alone. The handover advantage only exists when at least the formwork, steel and concrete are ours, so that is the combination we price most often.
How is a package quoted?
Itemised per element, with the pricing basis shown against each line. Measured quantities from the for-construction set, inclusions and exclusions written down, and rates held for thirty days.
What is excluded?
Concrete supply and pump, crane time, council permits and survey are normally on the builder's account, and they are listed as exclusions on the quotation so there are no surprises in the claim.
Who runs the package?
Michael, the company's director. He prices the package, runs it on site and issues the monthly claim with the subcontractor's statement and certificates attached, so commercial and site questions have one answer.
The four trades
Send the drawings.
Issue the for-construction set and say which packages you want priced. One itemised quotation within five working days, rates held for thirty.